Kitchen sink and faucet installation in Grand Rapids

A new sink is the one kitchen fixture you touch a hundred times a day. Here's how to get it set right the first time, especially under a new stone counter.

Quick answer: A kitchen sink and faucet install in Grand Rapids usually takes 2 to 4 hours and costs about $350 to $900 in labor and parts, not counting the sink and faucet. Undermount sinks are mounted to the counter by the fabricator; the plumber connects them.

Send your project details

Free. Send your project details and we'll get back to you within one business day. No obligation.

Undermount sink in a white kitchen island with a stainless pull-down faucet

What does a kitchen sink install include?

A kitchen sink install connects the sink to your water and drain. The plumber sets the faucet and its supply lines. They fit the basket strainers, assemble the tailpiece and P-trap, and tie the drain into the wall. They also connect the dishwasher drain and the disposal if you have them. Last, they test every joint for leaks with the water running.

Undermount, farmhouse or drop-in: what changes?

The sink style changes who does what and when:

  • Undermount. Mounted under a stone or solid-surface counter. The fabricator usually attaches it. The plumber comes after.
  • Farmhouse (apron-front). Needs a cabinet built or cut for it, and firm support underneath. Heavy fireclay models need extra blocking.
  • Drop-in. Sits on top of the counter. The plumber can set it and connect it in one visit.

Tell your plumber the sink model early. Deep single bowls can put the drain lower than your wall connection. That can mean lowering the drain in the wall.

How much does it cost in Grand Rapids?

These are 2026 planning ranges for labor and small parts. They exclude the sink and faucet themselves.

JobTypical range
Faucet swap, same holes$175 – $350
Sink and faucet, same location$350 – $900
Add new quarter-turn shutoff valves$90 – $200
Lower the drain in the wall$250 – $600

Ranges are estimates, not quotes. Old galvanized pipes, tight access or a stuck wall connection can push a job higher. Your plumber quotes the real number after a look.

What should I ask before hiring?

Ask these three questions and you’ll avoid most surprises:

  1. Is the drain height right for my new sink’s depth?
  2. Will you replace the shutoff valves and supply lines?
  3. Do you connect the disposal and dishwasher in the same visit?

Also ask whether the quote covers new supply lines and a new trap, and how long the workmanship warranty lasts.

Common questions

Who installs an undermount sink, the plumber or the counter company?

The countertop fabricator usually mounts an undermount sink to the stone before the counter is set. The plumber then connects the faucet, drain, trap, disposal and dishwasher. Confirm who does what before templating day. Have the sink on site that day too, so the fabricator can cut the opening to match it exactly.

Should I replace the shutoff valves too?

Yes, if they’re old multi-turn valves. A quarter-turn valve closes fully with one quick turn, which matters when a line bursts. Older multi-turn valves often seize or start to drip once they’re touched. Replacing them while the cabinet is empty is the cheapest time, at a planning range of $90 to $200 for the pair.

Can I reuse my old faucet on a new sink?

Sometimes. Check the new sink’s hole count and the counter’s hole layout first. A one-hole pull-down faucet on a three-hole sink needs a deck plate to cover the extra holes. Also look at the faucet’s condition. If it drips or the spray head sticks, a remodel is the cheapest time to replace it, since the plumber is already there.

Tell us about your kitchen plumbing

Tell us what you're planning. We read every request and get back to you within one business day to talk through the job.

  • Free, with no obligation
  • A reply from a person within one business day
  • Your details are never sold to lead marketplaces

What happens next

  1. We check that your ZIP code is in our Grand Rapids service area.
  2. We read your request ourselves. It isn't sold or sent to a list of companies.
  3. We get back to you within one business day to talk through the job.
  4. You decide what happens next. There's no obligation.

Your project details

10 digits, area code first

So we can reply in writing

5 digits, e.g. 49503

We use your details only to answer this request. Privacy policy.